Most Southwest Florida homes built before 1990 were connected to utility power with 100-amp service — enough capacity for the appliances of that era. Today, those same homes carry central air conditioning, pool equipment, electric water heaters, and increasingly, EV chargers and whole-home generators. Whether a 100-amp service can support that load comes up at the permit counter, during generator installations, and when an electrician opens a full panel and has nowhere to add the circuit you need.
Here’s what a service upgrade involves, who actually needs one, and how the process works for properties in Collier and Lee County.
What “Service Upgrade” Means
An electrical service upgrade is a change to the infrastructure connecting your home to the utility — the service entrance conductors, the meter base, and the main panel. It is not the same as a panel replacement, which swaps out an aging or defective panel at the same amperage.
A 200-amp upgrade increases the total capacity of electrical current available to the property. The work involves three connected components: the service entrance conductors running from the utility attachment to the meter, the meter base FPL meters through, and the main panel. All three may need to be replaced or reconfigured depending on the existing installation.
Who Actually Needs One
Not every older home needs a service upgrade. These are the situations where one becomes necessary or strongly advisable:
The panel is full. A panel with no open breaker slots cannot accept new circuits — for an EV charger, a generator transfer switch, or a new appliance. A full panel may mean the service is also undersized for the load, or it may simply need more physical space. A licensed electrician’s load calculation determines which.
A generator transfer switch requires it. Whole-home standby generator installations require an automatic transfer switch connected to the main panel. On a full or undersized panel, the generator installation may require the service upgrade as a prerequisite. Doing both at once is more efficient than sequencing them as separate projects.
An EV charger is being added. A Level 2 EV charger (240V, typically 32–48 amps) requires a dedicated circuit. On a 100-amp panel already carrying significant load, that circuit may not be available without an upgrade — the load calculation determines what’s feasible.
A permit requires it. When a building permit is pulled for an addition or renovation, the building department may require a load calculation as part of the electrical review. If the calculation shows the existing service cannot support the added load, the upgrade becomes a permit condition, not an option.
The existing service is pre-1980. Panels and service entrance equipment from this era may predate current electrical code requirements on grounding, overcurrent protection, and service entrance conductors. A service upgrade replaces both the panel and service entrance and brings both into compliance with the 8th Edition Florida Building Code, which currently references NEC 2020.
Note: Projects permitted after December 31, 2026 will be subject to the 9th Edition Florida Building Code, incorporating NEC 2023. If you are planning a service upgrade, discuss the permit timeline with your contractor.
What the Process Involves
A residential service upgrade in Sarasota, Charlotte, Lee & Collier counties is a permitted project.
The licensed electrical contractor pulls a permit from the local building department before work begins. This is submitted electronically and requires load calculations, a panel schedule, and a riser diagram for electrical work exceeding 30 amps. No permit means no inspection — and unpermitted electrical work creates code compliance and disclosure issues at resale. All electrical work in Florida must be performed by a contractor holding a Certified Electrical Contractor (EC) or Registered Electrical Contractor (ER) license issued by the Florida Electrical Contractors’ Licensing Board under DBPR. Verify any contractor’s license status at myfloridalicense.com before work begins.
The utility serving your property determines who coordinates the disconnect and reconnect. Florida Power & Light (FPL) serves most of the region — Collier County, much of Lee County, Charlotte County, and most of Sarasota County. Lee County Electric Cooperative (LCEC) serves portions of Lee County including Cape Coral and parts of Bonita Springs and Estero. Other areas may fall under a municipal or cooperative utility.
Your licensed electrical contractor identifies the correct utility and initiates the coordination through that utility’s project process. FPL’s process runs through fpl.com/construction; LCEC has its own service upgrade coordination process through lcec.net. Regardless of utility, power cannot be restored after a service upgrade until the work passes a building department inspection — the contractor manages both sides of that coordination.
Installation. The contractor replaces the service entrance conductors, the meter base if required by FPL’s equipment standards, and the main panel. Circuits are reconnected, breakers are sized to actual loads, and the panel is labeled. Power is off during the work. The on-site installation is typically completed in one day.
Inspection and reconnect. The building department inspects the completed work before your power company reconnects. After inspection approval, the utility restores service — their current standard is within 14 business days under normal operating conditions, we have seen them faster, but this provides a rough timeline. The full timeline from permit application to power restored typically runs one to three weeks or less depending on demand.
A Note on Cost
Service upgrade costs in Southwest Florida vary based on the condition of the existing service entrance, whether the meter base requires replacement to meet current your power companies equipment standards, the ampacity of the new panel, and the amount of circuit reorganization involved. Any quote that does not include a permit, scope, type of equipment, riser, removal, coordination, and location of the panel is not a comparable quote — permitted and unpermitted work are not the same thing.
Why Timing Matters Here
Southwest Florida’s hurricane season adds a dimension that doesn’t apply most places. Power companies project and reconnect timelines run on their standard schedule under normal conditions. During active storm recovery — as this region experienced after Hurricane Ian — utility scheduling timelines extend significantly. Planning a service upgrade outside storm season, and completing any related generator installation before the season begins, avoids that uncertainty.
What to Do Next
If your home is pre-1990, your panel is full, or you’re planning to add a generator, EV charger, or major addition — have a licensed electrician assess the current service before adding anything else. The load calculation tells you what you’re working with.